INSIDE M220 TOW Vehicle Installation See preceding page for instructions on installing control indicator in M113 APC. 1. Turn control indicator upside down. Bolt retainer plate to the bottom of the control indicator. Use the four bolts provided. 2. Put control indicator and retainer plate on shelf beneath TOW missile guidance system. Position retainer plate over four holes in shelf. 3. Attach retainer plate to shelf with four bolts provided. Tighten bolts.
Title | : | Operator's manual for Multiple Integrated Laser Engagement System (MILES), simulator system, firing laser, M63 (NSN 1265-01-077-6082) for M113APC and M220 TOW vehicle |
Author | : | United States. Dept. of the Army |
Publisher | : | - 1990 |
You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.
Once you have finished the sign-up process, you will be redirected to your download Book page.
How it works: